top of page

Customer Experience & Service Excellence

Pharma

On-site CSAT up 20% as email loops fall from 15 to 5 across CDMO operations

+20%

15 -> 5

On-site CSAT

Email thread length

The challenge

Specification mismatches, unclear instructions and long email loops slowed project execution across sites, with mixed proficiency causing inconsistent tone and avoidable back-and-forth.

The approach

A metrics-led Business and Email Communication programme tailored to CDMO operations introduced BLUF, GRACE and 6S writing frameworks for technical updates, deviation reports and customer requests.

The result

On-site CSAT rose 20% and email thread length dropped from 15 to 5, moving teams to a unified business-ready standard and strengthening client confidence.

A pharma manufacturer

bottom of page